The determination of project value for the purpose of calculating the permit feet, shall be the total value of all construction work, including all finished work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire extinguish systems, landscape, and other permanent work or equipment in accordance with Section 150.16 of the City Code. The value for all new construction should be consistent with the International Code Council square footage cost table based on the 2012 IBC.

Where work for which a permit is required by the Code is started or proceeded with prior to obtaining a building permit, the building permit fees shall be doubled in accordance with section 150.16 of the City Code.

Building Permit Fees

(Per $1,000 or fraction thereof)

Project CostProject Fee
$0-500$15
$501-1,000$25
$1,001-10,000$25 + $10/1,000 (over $1,001)
$10,001-20,000$125 + $9/1,000 (over $10,001)
$20,001-40,000$215 + $8/1,000 (over $20,001)
$40,001-100,000$375 + $7/1,000 (over $40.001)
$100,001-300,000$795 + $5/1,000 (over $100,001)
$300,001-500,000$1795 + $4/1,000 (over $300,001)
$500,001-750,000$2,595 + $3/1,000 (over $500,001)
$750,001 and up$3,345 + $2/1,000 (over $750,001)

Important note: Always round up!

Sample Calculation:
Project cost of $45,000

  • Base Fee (chart above) $375
  • 5 x $7 = $35
  • ($7 for every thousand above $40,001 ($45,000 - $40,001 = $4,999, rounded up to $5,000)
  • Base Fee $375 + $35 = $410

Project Cost Range Example (Please call 779-5302 if you have questions)

  • $10,000/$115
  • $20,000/$215
  • $30,000/$295
  • $40,000/$375
  • $50,000/$445
  • $60,000/$515
  • $70,000/$585
  • $80,000/$655
  • $90,000/$725

Note: In projects with multiple buildings, permits will be issued for each building separately. This allows buildings to be final-inspected and occupied as they are completed.

Sign Permit Fees
Valuation/CostPermit Fee
$0 - $100$15
$101 - $300$20
$301 - $500$30
$501 - $1,000$35
$1,001 - $3,000$40
$3,001 - $5,000$45
$5,001 - $7,500$65
$7,500 - $10,000$105
$10,000 and up$130

Portable or Temporary Signs - 30 day limit, twice per year (limited to C-3 Zoning Districts)
Fee is $1.00 per day

Building Plan Review

  • Preliminary review of drawing when requested - 25% of building permit fee.

Special Permits

  • Mobile Home Installation: $50 per mobile home
  • Demolition: $50 per structure
  • Moving: $50 per structure
  • Flammable Liquid: $40 per tank
  • Special Inspections: $75/hr. or fraction thereof (Any inspection for which no fee has been established or for temporary installation.)

Building, Fire and Sanitary Sewer Board of Appeals

  • Appeals: $250 filing fee

Zoning Board of Appeals

  • Appeals: $250 filing fee

If you need assistance, please call (989) 779-5347, Monday - Friday 8:00 a.m. - 4:30 p.m.