2008 CONSTRUCTION PROJECTS
Major Street Projects
• Washington Street (High to Bellows Streets)
The City will be removing the old pavement, storm and sanitary
sewer mains, and will be replacing it with new asphalt, curb and
gutter, storm and sanitary mains, and sidewalk.
Local Street Reconstruction
• Crescent Street (Glen to Highland)
• Sunset & Meadow (Crescent to Stockman)
• Williams Street (Broadway to Michigan)
• Franklin Street – Lansing Alley – Bellows to the north
The City will be reconstructing the above streets with new
pavement between the existing curbs. The project will involve
leaving the curb and gutter in place and installing a new street
base and asphalt between the existing curb and gutter. The
Williams Street and Franklin Street alley sections of the
project are special assessments that were petitioned by the
property owners.
• Island Park Road South
This project includes the reconstruction of the street with curb
and gutter with new storm sewer for drainage. The street work
will be combined with the planned replacement of the Oak Street
Bridge into a single project to be coordinated with the Parks
Department.
Asphalt Overlays
• Preston Street (RR tracks to East Campus Drive)
• Preston Street (Elizabeth to Lynnwood)
• Industrial Drive (Fancher to Mission)
• Gaylord Street (Fancher to Mission)
• Gaylord Street (University to Franklin)
• Appian Way (Mission to dead end)
• May Street (Franklin to Fancher)
• Elizabeth Street (Gaylord to cul-de-sac)
• Cherry Street (Oak to Washington)
• Cherry Street (Dead end to Oak)
• Main Street (Mosher to Pickard)
Water Main Replacement (*Directional drilling)
• Franklin Street (Mosher to Andre)
• Arnold Street (Gaylord to Bellows)
• Hopkins Street (Preston to Watson)
• Hopkins Street (Watson to Highland)
• Glenwood Street (Lynnwood to cul-de-sac)
*Directional drilling allows pipes to be pulled through drilled
holes, under streets and large trees.
Sanitary Sewer Relining*
• East of Mission Street (Maple to Cherry extended)
• Cherry Street extended (East of Anna to Eastlawn)
• West of Mission Street (Bellows to Preston)
• East of Mission Street (North of Andre to north of Palmer)
• East of Mission Street (Gaylord to north of Bellows)
• Michigan Street (Mission to Anna)
*Relining is done from existing manholes, eliminating the need
to dig up the street.
Sidewalk Replacement
Deteriorated sidewalks will be replaced in conjunction
with the Washington Street Reconstruction and the Water Main
Replacement projects. Sidewalk on the complaint list will also
be replaced.
A new sidewalk has been requested by a petition of the property
owners on both sides on Broadway Street from Williams Street to
the east City limits.