Millpond Park History
2000-2002:
Eastside river trail installed 2763 feet,
Eastside wetland overlook trail added 877
feet.
2001:
Renovate existing trail to barrier free, two
walking bridges were installed, fishing deck
added, two walk-down canoe landings added,
pond excavation, overlook observation deck,
new Millpond Park sign installed
2002:
Dam removal and river restoration with the
construction of five weirs, Completed a
trail system with three pedestrian bridges,
constructed an observation platform and
fishing deck, constructed a migratory bird
pond, constructed a new Leaton Street
entrance with parking at the north end of
the park
2003:
Playground replacement, two additional swing
sets, slide land
|