Section 2 - Existing Road System

2-1 EXISTING ROAD SYSTEM

The study area for the Urban Area Traffic Master Plan is the area bounded by the following roadways: Meridian Road on the west, Shepherd Road on the east, Baseline Road on the north, and Millbrook Road on the south. This area is outlined on Exhibit 2. Also included within Exhibit 2, is the federal aid urban boundary. This area has been identified by the Federal Highway Administration, the Isabella County Road Commission, the Michigan Department of Transportation, and the City of Mt. Pleasant to include the urbanizing area of the community. The FAU boundaries have not been changed since 1990. The FAU boundaries should be evaluated and expanded in order to include more of the more recently urbanizing areas of the community. This would specifically include the southeastern area of the community which is located south of Bluegrass, and east of Mission Street, and north of U.S. 27 BR. The boundary should also be extended to the east along M-20 to reflect the urbanizing activities due to the Casino development.

In order to receive federal highway funds for major street improvements, a street must be listed on the national functional classification system, and be included within the FAU district boundaries. Funds are available through various programs under the Federal Intermodal Surface Transportation Efficiency Act (I.S.T.E.A.) program. Separate grant applications are required for all-weather roadways, economic development roads, and major truck routes. A small amount of money is made available on a periodic basis to the City and Road Commission under the Small Cities Program. These funds amount to approximately $250,000 to $350,000 per project, which is available approximately once every three years for either the City or Road Commission. Each of these grants are competitive in nature and must be applied for and are judged against other communities applying for the same funds.

The primary north/south traffic corridor within the community, continues to be Mission Street. Isabella Road, which will be completed as a 4-lane roadway from Broomfield to Pickard Street this year, will serve as a reliever to Mission Street traffic volumes. Exhibit 3 includes the traffic volumes of major roadways within the central urban area. These traffic counts illustrate the volume of traffic on Mission and Pickard Streets, which varies from 26,000 vehicles per day at Mission and Broomfield, to 22,000 vehicles per day at East Pickard near U.S. 27. Pickard Street, with it's upgrade to 4 lanes for most of its' length, has experienced increasing volume of traffic, which is approximately 15,000 to 17,000 vehicles per day.

The commercial and retail development of the community is primarily concentrated in the north/south direction along the Mission Street corridor. Additional development has occurred on Pickard from Mission to Summerton Road. As a result, traffic has concentrated along these two primary traffic corridors. The proposed construction of additional north/south routes will help to relieve this traffic volume. Once Isabella Road is completed later this year, then additional traffic will utilize that corridor. The major streets that have been connected to complete the City grid, such as Bellows, Preston, and Sweeney Street, have helped to complete the major street traffic grid and to relieve congestion that would have occurred otherwise along Mission Street. West Broadway, from Bradley to Lincoln Road, is the primary major street within the City of Mt. Pleasant which does not connect to the major County road grid.